Bolzano Trade Fair

Project Details

A custom solution was designed and implemented for the H1 event hall at the Bozen Trade Fair. The system consists of 8 high-performance hoists that can be moved laterally on the walls, each with a load capacity of up to 1.5 tons. The hoists can be driven individually, but also synchronously. This allows the installation of 4-point trusses between the hoists, which can carry a load of up to 3 tons and thus be used as a stage hoist. When not in use, the trusses are dismantled and the hoists can be driven individually.

Customer

Bozen Trade Fair

Architect

Höller Klotzner

Construction year

2021

Scope of delivery

  • Mechanical high-performance hoists with encoder and load measurement with a lifting capacity of up to 1.5 tons
  • Truss system for stage equipment
  • Touch panel control
  • Cable scissors system
PDF-Datei: PDF-Download
Share this project:

More projects

Theater Astra Bressanone
Sarnthein automated orchestra shell