Project Details
The delivery includes the design and production of a complete stage technology system for the four-year Wagner opera “The Ring of the Nibelungs” with numerous mechanical platforms, lifting and special solutions. In addition, structural steel structures and laterally automated movable hoists were installed. The entire system, including control, was realized in SIL 3. Larcher continues to support the customer with additional projects and the annual maintenance of the installed stage technology facility.
Customer
Strabag and Tiroler Festspiele
Determination
Stage equipment for the Wagner opera “The Ring of the Nibelungs”
Construction year
2021-2022
Scope of delivery
- Stage steel structure
- Turntable 8m mechanically retractable
- Various lifting platforms
- Mechanical double lift platforms
- Steel constructions
- Movable stage truss with integrated hoists according to DIN EN 17206
- Chain hoists C1
- Complete stage control in SIL 3